The redevelopment opening late 2022 provides new learning, social and sporting infrastructure in two substantial buildings with major civil engineering works to create usable volume on the land-locked site. The Aquatic and Fitness Centre with Olympic Pool is located under the main playing field, and the Centenary Building provides a major sport and assembly hall with drama theatre teaching spaces and rooftop lawn and chapel excavated into the hillside.
My role was as Project Leader from design competition through to construction tender.
c$125m